Guwahati: Assam Health and Finance Minister Dr. Himanta Biswa Sarma on Monday took to his Twitter handle to share the 3D view of the proposed 4 Lane Maligaon Fly-Over.
The approximate length of the proposed fly-over is 2.9 Km.
The construction work of the fly-over is likely to start within October 2020.
Dr. Sarma tweeted, “3D view of the Proposed 4 Lane Maligaon Fly-Over ( Length 2.9 km). Construction will start within October 2020.”
3D view of the Proposed 4 Lane Maligaon Fly-Over ( Length 2.9 km). Construction will start within October 2020. pic.twitter.com/rKkhb4WPeR
— Himanta Biswa Sarma (@himantabiswa) September 28, 2020