peepl-small

Minister Dr. Himanta Biswa Sarma shares 3-D photos of proposed Maligaon Fly-Over

PUBLISHED:

Guwahati: Assam Health and Finance Minister Dr. Himanta Biswa Sarma on Monday took to his Twitter handle to share the 3D view of the proposed 4 Lane Maligaon Fly-Over.

The approximate length of the proposed fly-over is 2.9 Km.

The construction work of the fly-over is likely to start within October 2020.

Dr. Sarma tweeted, “3D view of the Proposed 4 Lane Maligaon Fly-Over ( Length 2.9 km). Construction will start within October 2020.”

RELATED ARTICLES